Categories
Announcements Mass Transit (LRT/MRT/METRO) News & Events RapidKL Transit Infrastructure

New Ampang Line trains introduced (update 1)

Prasarana and RAPIDKL will be introducing the new Ampang line trains at 3 pm on Thursday, February 27th.

Click on the links below for images of the trains.
http://t.co/1CfbldOlEt
http://t.co/qrpqoeJR9k

Update:

This article by fz.com is one of many with details about the new trains which will begin arrival in Malaysia in September 2014.

The important details:

*50 units of 6-car trains designed and built by CAR Zhuzhou (which also built the “Six Car Set” for KTM Komuter)
*30 of these trains will replace the trains currently used on the Ampang line … which are only entering their 20th year (generally train carriages are expected to last approximately 30 years … Although the measurement is really based on kilometers traveled rather than time in service)
*20 of the trains will be used on the Ampang line extension when it opens in 2016
*The trains will have open gangway allowing passengers to walk between all the cars (as compared to the 3 pairs of cars in the current trains) spreading out the passenger load

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s